Modular Building Case Studies
Sustainable and Energy-Efficient Solutions from DMDmodular
DMDmodular has recently achieved a significant milestone by successfully completing a relevant energy-efficient housing project, fully financed by EU funds, that tackles the industry’s most pressing challenges.
Read MoreThe Rapid Rise of Affordable Modular Housing in Canada
Canada’s Rapid Housing Initiative represents a huge success for the modular construction industry, and MBI members are building modular multifamily homes fast. Here are some examples.
Read MoreInnovating in Modular Construction: BROAD’s Holon Building
Inside BROAD Group’s innovative Holon Buildings, built with BROAD’s new B-CORE stainless steel building material.
Read MoreModular Multi-family Case Study: The Graphic
Modular Multi-Family Case Study: The Graphic About the Author: Kendra Halliwell, AIA, LEED-H AP is an Associate Principal, Practice + Design Team Leader, at ICON Architecture, Inc., a women-owned, Boston-based firm with award-winning work focused on innovative, sustainable mixed-use projects. Recently Project Manager for The Graphic, the largest modular construction project in the City of…
Read MoreModular Bathroom Case Study: Holiday Inn, Dublin Airport
Roman was contracted to supply showers, anti-slip solid surface shower trays, and integrated vanity units for the prestigious IHG Dublin Airport Holiday Inn.
Read MoreMayfair: A Modular Case Study
The Mayfair development in El Cerrito, CA brings 223 new affordable modular housing units to a long-neglected neighborhood.
Read MoreMetric Modular’s Bella Bella Passive Haus
The project consisted of six, two-story attached townhomes to be used as a desperately needed housing solution for Yale First Nation.
Read MoreModern Building Systems- 8 Classroom Complex
Yelm School District desired a practical and temporary 8,200 square foot classroom solution, all under one roof, to house their growing student population.
Read MoreBlazer Industries – Pediatric Dental Clinic
The goal of the client was to provide top notch affordable care while minimizing additional overhead costs.
Read MoreATCO Structures & Logistics LTD. – Temporary Emergency Facility
The Montreal Heart Institute (ICM) temporary emergency building layout, comprising 42 modular units, was carefully planned with various hospital departments to meet the technical and operational requirements to run a busy emergency room.
Read More