Wraptite® Airtightness Protection for Northampton School for Boys
The Wraptite external air barrier system from the A. Proctor Group has been chosen for its high-performance, airtight insulation for a Department for Education (DfE) funded project of the offsite construction of Northampton School for Boys Multi-Academy Trust.
The new project forms part of a full turnkey solution provided by Algeco, acting as Principal Design and Build Contractor alongside Watson Batty Architects. The project includes a total of 210 modules using Seismic technology, plus a hybrid structure for the halls, to create the 1200-place new secondary school, including sixth form.
Utilizing Seismic technology for the Northampton school modules will deliver important benefits; it is 75% faster and achieves a 47% improvement in value compared to traditional construction techniques; it even offers a 33% improvement in speed when compared with standard modular construction.
In terms of sustainability, Seismic delivers significant reductions in both operational and embodied carbon of up to 70%. This is achieved through factors including design efficiency, materials selection and manufacturing effectiveness, leading to limited wastage.
A vital element of modern design and construction is to maximize energy efficiency. Controlling spiraling energy costs is particularly key in educational facilities such as schools and colleges.
The Wraptite air barrier system is a safe and simplified membrane system. It provides a fully self-adhered vapor permeable air barrier certified by the BBA and combines the critical properties of vapor permeability and airtightness. This approach saves on both the labor and material costs associated with achieving the energy efficiency demands in buildings.
The self-adhesive design is perfectly suited to offsite manufacture, easy and quick to apply. Installing Wraptite at a low level in the factory enables the membrane to be easily applied and avoids the risks of working at height. Offsite installation also enables the product to be installed in completely dry conditions to ensure full adhesion in a quality-controlled environment to deliver the required airtightness requirements. The product is very durable and provides excellent protection in transit and on-site.
The high vapor permeability of the Wraptite air barrier allows the substrate beneath to dry quickly and moisture vapor to escape and reduces the likelihood of mold, mildew, condensation, timber distortion and metal corrosion.
Also specified alongside Wraptite was Protech GM Super, a high-performance proprietary reinforced gas barrier that has been specifically designed by the A. Proctor Group to conform with the latest guidance.
The technical team at the A. Proctor Group provides comprehensive guidance to architects and contractors in specifying membranes.
More from Modular Advantage
From Model to Machine: Why Modular Scale Is Becoming a Software Problem, not a Material One
For modular manufacturers that have already secured demand and repeatable volume, the next major constraint may no longer be forming capacity itself. Increasingly, it is the continuity of the information feeding that capacity.
Who Will Define Modular Products for AI?
Artificial intelligence is making building configurators easier and less expensive to create. This makes urgent manufacturers’ need portable product definitions, stable identities, and shared interfaces regardless of how others’ software is produced.
From BIM to Robotic Production: A Digital Workflow for Customized Components in Volumetric Modular Construction
For volumetric modular manufacturers, the value of this workflow is not simply the use of robotics. Its real value is continuity.
Helping Build a Common Framework for Modular Construction in Canada
Canada’s modular construction sector continues to gain momentum, but scaling it successfully will depend on shared expectations across design, manufacturing, approvals, and project delivery. CSA Z251 helps provide that common foundation.
Edges, Exits & Equipment: A Modular Builder’s Guide to Rooftop Access
Rooftop access belongs in the factory design. Before the modules ship, the project team should identify each route’s users, confirm applicable requirements, coordinate with the roof system and structure, and assign responsibility.
When Timber Production and Modular Construction Share One System
As demand for multifamily and workforce housing continues to outpace what conventional construction timelines can deliver, models that reduce the number of handoffs between structural fabrication and modular assembly are likely to draw more attention.
Your AI Strategy Is an Enablement Strategy
Tools will change. Teaching employees only the steps in one platform creates a narrow capability. Involving them in problem definition, process mapping, data assessment, controls, and measurement gives the organization a way to improve its systems as technology evolves.
By-Right Permitting: The Missing Lever for Scaling Modular Multifamily
Modular has already proven it can outperform traditional building methods on speed and cost per unit. The next frontier is outside the factory in the front end of the process, where projects either clear a path to construction or get stuck in review.
Remote Inspections and The Future of Factory Oversight
Remote inspection is becoming a practical part of modular construction oversight. Its value is greatest when it is used selectively, governed by clear procedures, and supported by complete traceability.
Reimagining Dry-In: How a Temporary-to-Permanent Roofing Strategy Mitigates Risk Between Modular Installation and Final Roof Construction
As volumetric modular projects continue to increase in scale and complexity, the Temporary-to-Permanent FiberTite Roof System represents an example of how traditional trade scopes can be reimagined through Design for Manufacturing and Assembly (DfMA) principles.