16’ x 37’ Welded Substation Enclosure

Challenge: Raytheon Technologies needed a transformer to be enclosed and protected against the specific weather conditions in Guam. The challenge was to create a structure to meet these conditions while remaining cost-friendly.

Solution: Instead of sourcing a new transformer, which would have taken over 100 weeks and cost several million dollars, Raytheon turned to Panel Built Inc. for a modular solution. We designed a 16’ x 37’ prefabricated enclosure that we could deliver to Guam in two pieces. Once it was put together, it was lowered over the transformer.

Benefits of Panel Built Construction

  • Minimized Resource Constraints. Since we fabricated the station under one roof, we prevented our customer from having to source labor, equipment, and materials.
  • Quick Turnaround. Our modular approach to construction allowed for a quick turnaround time for building and allowed us to transport the structure from Blairsville, GA, to Guam in just four weeks.
  • Weatherproof. We designed the station’s structure to accommodate Category 5 hurricane conditions, such as a 210-mph wind load.

Key Features

  • Exterior Walls. The station has 3” thick steel walls with a stainless-steel finish welded onto 14-gauge framing, providing a sturdy structure capable of withstanding harsh wind conditions.
  • Impact-Rated Doors. The aluminum single door measured 36” w x 84” h x 1 3/4” thick, with 16 gauge steel projection. The double doors are also made from aluminum and are 72’’w X 84” h X 1 3/4” thick, with a 16-gauge steel projection. The roll-up door is 26’ 5” Wide by 10’ High. These doors are impact-rated for storm conditions, giving the transformer extra protection.
  • Floorless. The floorless design facilitated easy installation by allowing the enclosure to be lowered over the transformer.
  • Electrical Package. This substation was outfitted with 12 Ga. Min copper wiring in 1/2” EMT surface-mounted, pre-wired before final installation, which ensured a reliable electrical system.
  • HVAC System. We installed two 18-ton HVAC units and heating systems with redundancy, guaranteeing optimal temperature control for the enclosed transformer

Conclusion

Panel Built’s 16’ x 37’ Welded Substation Enclosure for Raytheon proves our commitment to excellence and innovation. This project showcases our ability to meet unique challenges by delivering tailored solutions prioritizing durability, security, and efficiency in every aspect of design and construction.

More from Modular Advantage

A Huge Win for the Modular Construction Industry in Massachusetts

In early February, 2024, the Massachusetts Board of Building Regulations and Standards (BBRS) released its proposed 10th Edition building codes. This draft included several amendments targeting modular construction that would have created an extremely difficult environment for the entire modular industry and could have eliminated the industry entirely in the state.

FEMA Announces Hawaii Housing Plan Using Modular Construction

Utah becomes the second state in the country, following Virginia, to fully adopt ICC/MBI standards 1200 and 1205. MBI will continue to work with leadership in Utah to implement the new program.

Supply and Demand: Solving Canada’s Housing Crisis One Relocatable Housing Unit at a Time

Not only do Moda Modular’s repurposed employee housing solutions cut the emissions related to construction down to nearly zero, but they also keep building materials that are often not biodegradable from slowly decaying in storage facilities.
It’s the classic environmental mantra of reduce, reuse, and recycle, scaled up and applied to building after building.

ICC/MBI Standards 1200 & 1205 Provide Foundation for Utah’s First-Ever State Modular Program

Utah becomes the second state in the country, following Virginia, to fully adopt ICC/MBI standards 1200 and 1205. MBI will continue to work with leadership in Utah to implement the new program.

Repetition, Communication, and Coordination: A QSR Case Study

This modular QSR project seemed like any another modular building on the surface. Inside, it was anything but. The rhythm, the desire to iterate and repeat, and the constant communication between all parties made it stand out.

Modular Architecture: Thinking Outside of the Box with Sara.Ann Logan

At a time when modular buildings were still seen as less than by many in the architecture and construction world, Sara.Ann Logan took the plunge and partnered to launch a design-build firm that designed, built, and constructed modular high-end single-family homes. But even though she could see the value of this kind of construction, it wasn’t universally accepted.

Colorado Developer ‘Attacks’ Attainable Housing Crisis

City, county, and state government bodies are reaching out to Fading West Development, a modular manufacturer and developer in Buena Vista, CO, to learn more about how they are using modular construction to solve the affordable housing crisis in Colorado. Governments are eager to learn how they’ve made modular development successful and profitable while meeting the growing need for affordable housing.

CES Group’s Stuart Cameron Will Convince You the Moon Is Achievable with Modularized MEP

While most people think of construction as a gradually layered process, MEP assemblies—such as the modular ones—tend to provide all-in-one installs, like a car factory. A modular MEP product helps developers, architects, and fellow modular manufacturers reach their goals through early integration and planning. MEP assemblies address all the unseen things like electrical, heating, and plumbing when looking at a finalized building. The very nature of MEP assemblies are crucial to any initial prospectus.

Automation: The Future for Offsite Modular Construction

Offsite modular construction lags far behind other industries in embracing and adopting automation. Some people believe it will decrease jobs. Others feel they’ve done okay without it, so why change? In reality, conventional construction methods simply cannot keep up. Cooper Lane of Brave Control Solutions points to the labor shortage and the housing crisis that’s rampant in Canada, the U.S., and globally.

Seizing the Modular Construction Opportunity

The CSA Public Policy Centre’s new report, Seizing the Modular Construction Opportunity, highlights how innovative modular methods can help to bring various building forms—from single unit housing to complex high-rises—online more quickly. Owing to efficient manufacturing practices and controlled factory environments, modular can achieve completion rates that are 25% to 50% faster than conventional construction approaches.