Skip to content

Through It All, It’s Still About the Workers

Anirban Basu, CEO of Sage Policy Group and Chief Economist of the Modular Building Institute

By February 2024, the number of available, unfilled construction job openings had reached an all-time high. At some point, interest rates will fall, creating another surge in demand for such workers. In short, solving the nation’s skilled worker shortage issue has never been more important.

Read More

Digitalizing Your Products for Seamless Integration into Modular Projects

building digitalization using software from KOPE

KOPE enables products to carry information on product data, drawing templates, links to other products and systems, and the rules on how they should be configured and arranged in projects. We need to get rid of moments where decisions are translated either from one skill set to another and from one file type to another. The data that informs you should also be the data that gets passed along to the next link in the chain.

Read More

How to Fail at Delivering a Modular Project

A set crew places part of a volumetric modular building

Success can involve challenges, but it often provides valuable experiences that can be replicated in future endeavors. Failures can be categorized into two types: those that transform into successes through perseverance, and those that are resolved during the project but serve as valuable lessons to avoid in the future. Here are a few to avoid on your next project:

Read More

Developing the Offsite Workforce

Local students attend MBI's 2024 World of Modular conference and tradeshow in Orlando, FL

Workforce development and labor challenges continue to be a topic of discussion and area of opportunity for the construction industry, and during this year’s World of Modular conference in Orlando, The Workforce Development Lounge (“The Lounge”), hosted by Momentum Innovation Group, was launched to provide a space for attendees to network and collaborate on labor solutions and resources.

Read More

Fire Station 67

Fire Station 67, a modular firehouse designed by Wittman Estes

Fire Station 67 is designed in direct response to the climate crisis, the increasing threat of wildfires, and the needs to the Rancho Mission Viejo community. Prefabricated off-site and assembled from 10 modules, the 4,667-square-foot fire station is a modular design with the ability to reconfigure the structure into something new in the future.

Read More

Maceo May

Maceo May

Maceo May is a six-story, all-electric modular construction, affordable housing development located on Treasure Island in San Francisco Bay. The climate-responsive design provides 104 homes for formerly homeless veterans and their families with a strong focus on decarbonization, resilience and wellness. The apartment building offers 1 on-site manager’s unit, and a mix of 24 studio, 47 one-bedroom and 34 two-bedroom units.

Read More

World of Modular Europe to Bring Industry Insights, Expertise to Brussels

Michael Hough, principal at MJH Structural Engineers, stands next to the core of 101 George Street in London, a high-rise volumetric modular project he and his team engineered. Photo credit: Michael Hough.

Speakers from around the UK and Europe will be presenting at World of Modular Europe, including Michael Hough, principal at Ireland’s MJH Structural Engineers, and Franco Vietti, associate at Holland-based Green Prefab. Both Hough and Vietti will be sharing—among other things—their insights on the industry based on their 20-plus year careers.

Read More

U.S. General Services Administration Requires ICC/MBI Off-Site Construction Standards in Design Requirements Update

U.S. Federal Government’s Largest Civilian Real Estate Provider Requires ICC/MBI Off-Site Construction Standards in Design Requirements Update The General Services Administration (GSA) Facility Standards (P100) also reestablishes the International Codes®, including the International Plumbing Code®, as the building codes for federal construction The U.S. General Services Administration (GSA) has finalized the 2024 edition of the…

Read More