Skip to content

Colorado Awards Modular Housing Loans to Fading West, Guerdon, and Others to Create Up to 4,755 More Housing Units Per Year

Creating Housing and Jobs: Polis Administration Announces Modular Housing Loans for Fading West, Guerdon, Others to Create Up to 4,755 More Housing Units Per Year Gov. Jared Polis, the Colorado Office of Economic Development and International Trade (OEDIT), and Colorado Housing and Finance Authority (CHFA) just announced funding to support the growth of eight modular…

Read More

The Sphere Made Possible with Exterior Wall Panels

Prefabricated wall panels were used to build The Sphere in Las Vegas

This one-of-a-kind structure required one-of-a-kind building materials and exterior cladding that could accommodate the atypical geometries, project timelines, and significant daily foot traffic. Offsite construction, in the form of Dryvit’s Outsulite prefabricated panels of continuous insulation (CI), was the key method for streamlining the façade installation and ensuring quality control for the difficult building connections.

Read More

Offsight’s Digital Certification Program Can Accelerate Modular Industry Growth

Offsight Certification Program

Offsight launched its Offsight Certification Program in January 2024. Its program is designed to equip production managers, quality inspectors, plant managers, and operators with a deeper understanding of how technology and digitization can be a game-changer in driving process improvements and productivity benefits, which will ultimately allow its customers to capture the full value of modular and offsite construction.

Read More

Modular Construction for Financial Viability: The Norwalk Project Case Study

The Norwalk multifamily modular project serves as a prime example of how Off-site Modular Construction, in collaboration with Architects, Consultants/Engineers, General Contractors (GC), and Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP) Subcontractors

The Norwalk project serves as a prime example of how Offsite Modular Construction, in collaboration with Architects, Consultants/Engineers, General Contractors (GC), and Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP) Subcontractors, can make projects financially feasible by closely working with the Owner/Developer under an Integrated Project Delivery (IPD) approach.

Read More

STAAT MOD Patient Bed Expansion at M Health Fairview – St. John’s Hospital

hospital built using modular construction

Construction firm The Boldt Company, and interdisciplinary design firm, HGA were engaged by St. John’s Hospital to deliver a 16-bed ICU patient observation wing onto the existing facility, built to over 90 percent completion offsite in Appleton, Wisc., then seamlessly transported and installed on the St. John’s campus – the first of its kind in the state of Minnesota.

Read More

Formula 1 Race, Las Vegas, Nevada

modular elevators at the Las Vegas F1 Grand Prix

In partnership with InProduction, Phoenix Modular Elevator (PME) designed, manufactured, and installed seven modular elevators for the F1 Grand Prix race in Las Vegas, Nevada. To minimize space, the design utilized machine roomless (MRL) hydraulic elevators, eliminating the need for separate machine rooms for each elevator. Instead, using the MRL design, the machine room equipment is built into the hoistway, and accessed via a small door on the side.

Read More

Silverking Student Housing, Selkirk College

ROC Modular was proud to deliver a much-needed new permanent modular Student Housing Residence for Selkirk College, located at the Silverking Campus in Nelson BC.

ROC Modular was proud to deliver a much-needed new permanent modular Student Housing Residence for Selkirk College, located at the Silverking Campus in Nelson BC. The project is a 3-storey, 12-module 38-student bed building with a mass-timber main common area for student amenities.

Read More

Parkhurst Elementary School Classroom Additions

Modular school classroom addition by Triumph Modular

The Parkhurst Elementary School in Winchester, MA, has recently undergone an expansion of 13,074 square feet. Due to renovations at the neighboring Lynch School, students were temporarily relocated to Parkhurst. Modular construction was chosen as the preferred method to accommodate the influx of students and prepare for the start of the 2023-2024 school year.

Read More

VBC Chooses MAESTRO SMART 9 HP

Olimpia Splendid MAESTRO SMART 9 HP

Volumetric Building Companies (VBC), a global leader in the construction sector with a focus on building the future through volumetric modular techniques, choose the Maestro Smart 9 Heat Pump as their ideal comfort solution to heat and cool their modular housing project in Philadelphia, PA, consisting of 60 modular housing units.

Read More