Modular Multifamily Housing as a Scalable Solution to the Housing Crisis

Snapshot of the Modular Housing Sector and the GreenStaxx Solution

Amelia Rono, Research & Communications Intern, GreenStaxx; Growth and Structure of Cities student, Bryn Mawr College

Amelia Rono is a Research & Communications Intern at GreenStaxx and a Growth and Structure of Cities student at Bryn Mawr College.

The Productivity Crisis

The construction sector has faced mounting challenges over the past several decades, with the COVID-19 pandemic further exposing deep infrastructure inefficiencies. According to a 2025 McKinsey & Company report by partners Jan Mischke, Kevin Stokvis, and Koen Vermeltfoort, global construction productivity advanced only 10 % over 22 years, which was only one-fifth of the growth seen in other economic sectors1.

A separate McKinsey report from 2024 found further details that productivity within the construction sector actually declined 8% from 2020 to 2022, with no productivity gains in advanced economies like the U.S. and Europe2. This lack of productivity has resulted in a $ 40 trillion global productivity shortfall, which has only been exacerbated by the reduction of skilled labor. Compounding the issue is the labor shortage: job vacancies in U.S. construction nearly doubled between 2017 and 2023, and 41% of skilled workers are expected to retire by 20312.

Austin-St_1200x799

28 Austin Street, Newton, MA, designed by GreenStaxx with RCM as the Modular manufacturer.

Modular Housing as the Response

While these statistics paint a grim picture, they also highlight an opportunity: modular construction. Prefabricated and modular methods offer a practical, scalable path to increase productivity in housing.

A report by Emily Gallagher from Propmodo identifies prefab modular multifamily housing as an effective solution to meet the increased demand for housing. The housing crisis in the US has only increased post-pandemic, with the US currently dealing with an apartment shortage of 600,000 units3. 4.3 million apartments should be built by 2035 to meet current demand, but due to the labor shortage and lack of productivity within the construction sector, time constraints threaten progress. Quality standards should not be sacrificed in order to meet these demands.

Despite being unfairly portrayed in the past, the modular housing industry could be the solution. Gallagher identifies time efficacy as one of the biggest roadblocks to meeting ongoing housing demand. The MBI 2024 annual report highlights research conducted about the modular industry that reveals how modular housing is not only time-effective, but cost-effective as well4. McGraw-Hill’s 2020 research demonstrates overwhelming contractor support for modular construction, with 91% citing favorable budget outcomes in the SmartMarket report “Prefabrication and Modularization: Increasing Productivity in the Construction Industry”. Furthermore, 48% of contractors indicated that costs decreased by 10%, and 68% reported a positive budget impact of greater than 5%.

The 2023 study “Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication” from the University of Nebraska’s Durham School of Architectural Engineering and Construction demonstrates the economic advantages of prefab and modular construction. The study highlighted that the cost for modular projects averaged $243 per square foot, compared to the $251 per square foot for site-built projects.

Beyond cost efficiency, modular building also offers time efficiency, with the 2019 McKinsey and Company report “Modular construction: From projects to products,” outlining how modular projects accelerate timelines by 20-50%. Since 60-90 % of modular construction is conducted within factories, weather delays are reduced, resulting in a quicker return on investment, which is critical for developers trying to match the rising demand for housing.

Yet, despite these advantages, modular construction only accounts for 4% of new housing in the U.S.5. Modular construction has the capacity to compress project schedules by 20-50% while achieving cost reductions of up to 20%. Regardless of its potential, installation, capital requirements, and stakeholder resistance, particularly from developers and general contractors unfamiliar with the process, continue to hold the sector back.

Brookside_Ext_Entry_wSignage_1200x799

Brookside Square, 70 Beharrell Street, Concord, MA designed by GreenStaxx.

GreenStaxx: A Scalable, Developer-Focused Solution

GreenStaxx is actively working to overcome these limitations with innovative methods to increase efficiency in modular construction.

The 2023 McKinsey and Co. report highlights how modular construction is inefficient when the stakeholders (e.g., developers and general contractors) are unable to collaborate. GreenStaxx is working to address this inefficiency. Their patented process is built for developers by architects/developers who understand the industry and its needs. GreenStaxx is focused on building long-term partnerships with general contractors and modular manufacturers to improve coordination and reduce delays, which has proven to enhance profitability and consistency of outcomes within modular construction5.

Greenstaxx uses a standardized design process that allows for greater efficiency, reduced risk, improved quality, and lower costs. Standardization is key to avoiding the inefficiencies of the traditional construction industry. Traditional construction and most modular projects work on a custom basis, adding complexity and cost. GreenStaxx provides a library of standard unit designs with detailed specs. This gives developers clarity upfront and creates a repeatable process, allowing developers to build smarter, faster, and with more confidence.

The Triple-Decker: A Smaller-Scale, High-Impact Model

In addition to their scalable multifamily product library, GreenStaxx offers a more compact solution: the triple-decker. This three-unit building typology, typical within the northeast, has been redesigned for modular construction and optimized for passive house standards.

In Massachusetts alone, where GreenStaxx is based, there is a shortage of 222,000 housing units6. The triple-decker delivers much needed, quality, energy efficient housing on smaller urban lots. It can also be adapted into a two-family configuration, or “double-decker” and built with repeatable modular components. For modular manufacturers, the triple-decker design is ideal: compact, efficient, and built for rapid construction.

Furthermore, permitting and construction timelines are shorter, making the triple-decker an excellent option for infill development and small-lot strategies in cities struggling to meet housing demand.

Conclusion

The U.S. housing crisis won’t be solved with conventional methods alone. Modular construction has proven advantages, but without a shift in how projects are designed and delivered, the sector’s growth will remain limited.

GreenStaxx provides a real-world, scalable solution through its standardized library of modular-ready multifamily designs and its innovative triple-decker model. Together, these offerings address the industry’s two greatest needs: efficiency and adaptability.

By focusing on quality, repeatability, and collaboration, GreenStaxx is helping move modular construction from niche to mainstream and offering a practical path toward solving the housing shortage.

Triple-Decker-Passive-House-Modular-Cambridge_800x961

Triple-Decker Passive House Modular, 159 Allston Street, Cambridge, MA

References

1 Mischke, Jan, Stokvis, Kevin and Vermeltfoort, Koen. “Why Construction Productivity Growth Is Lagging — and What to Do About It.” Construction Dive, January 2, 2025. https://www.constructiondive.com/news/why-construction-productivity-lags-mckinsey/736082/.

2 Mischke, Jan, Kevin Stokvis, and Koen Vermeltfoort. “Delivering on Construction Productivity Is No Longer Optional.” McKinsey & Company, August 9, 2024. https://www.mckinsey.com/capabilities/operations/our-insights/delivering-on-construction-productivity-is-no-longer-optional.

3 Gallagher, Emily. “Can Prefab Construction in Multifamily Overcome the Technology’s Image Problem?” Propmodo, January 25, 2025. https://propmodo.com/can-prefab-construction-in-multifamily-overcome-the-technologys-image-problem/.

4 Modular Building Institute. “2024 Permanent Modular Construction Report: The Modular Building Institute’s Key Findings and Best Practices for Successful Modular Projects.” Modular Building Institute, 2024. https://www.modular.org/industry-analysis/.

5 Blanco, Jose Luis, Dave Dauphinais, Garo Hovnanian, and Rob Palter. “Making Modular Construction Fit.” McKinsey & Company, May 10, 2023. https://www.mckinsey.com/capabilities/operations/our-insights/making-modular-construction-fit.

6 Taylor, Sri. “Massachusetts Needs 222,000 Housing Units by 2035 to Ease Crisis.” Bloomberg, February 6, 2025. https://www.bloomberg.com/news/articles/2025-02-06/massachusetts-needs-222-000-housing-units-by-2035-to-ease-crisis.

More from Modular Advantage

Homes as Essential Infrastructure

The housing crisis is nothing new. Across the world, federal, state, and municipal governments of all sizes are struggling with how to provide more affordable housing—quickly—to those who need it. In Canada, Paul Halucha, Deputy Minister of Housing, Infrastructure, and Communities Canada (HICC), argues that the federal role in housing has shifted from funding at arm’s length to actively shaping outcomes.

Building the Future, Offsite

In the face of a national housing crisis, England stands at a critical inflection point where innovation, scale, and public-private partnerships must converge to meet an urgent need: more homes, and fast. Homes England is helping reshape the housing market by actively supporting MMC through a strategic blend of land development, financing, and grants.

How POJI and MOKO Are Industrializing Modular Construction Through Automated Engineering Systems

Working with Scandinavian Industrialized Building System (SIBS), POJI and MOKO helped realize a modular city concept located in Järfälla
municipality of Stockholm, Sweden, with 350 apartments, communal areas, restaurants, small shops, and a preschool in a pleasant mix with
experiential architecture and greenery.

Inside Boutique Modern’s Mission to Make First Homes Affordable and Efficient in The U.K.

The U.K.-based firm has been in business for 12 years, manufacturing houses for both private clients and local government, with a large chunk of its business coming from “affordable” and social housing. Working in a 32,000 square-foot factory in Newhaven, Sussex, Boutique Modern is changing decades-old thinking about constructing houses, all through the use of modular.

BoulderMOD: Producing Affordable Modular Homes While Training the Workforce of the Future

Colorado has been hit with a double whammy—a decline in the number of skilled construction workers and an increased need for affordable housing. BoulderMOD, a partnership among the city of Boulder, Flatirons Habitat for Humanity, and Boulder Valley School District, is tackling both problems and helping others do the same.

Guerdon: Seeking the ‘Holy Grail’ of Modular Construction

Guerdon, a modular manufacturer in Boise, Idaho, recently won what
Laurence (Lad) Dawson, CEO and Managing Partner, describes as the ‘holy grail’ for a modular manufacturer. The RFP calls for a pipeline of six
projects, totaling approximately 570
units.

State of Modular in 2025: Facing Reality

The critical and urgent reality is that the modular industry needs to open the doors to collaboration across all sectors. The sooner we stare down these challenges, the sooner we can welcome a new reality where modular is the dominant way to deliver housing for better performance, quality and all at a lower cost.

Sealed for Success: The Role of Waterproofing in Modular Construction

Water is one of the biggest threats to any building, causing structural damage, mold growth, and costly repairs if not properly managed. Waterproofing is the first line of defense, ensuring durability and long-term performance. As construction methods evolve, so do waterproofing solutions – moving beyond traditional coatings to advanced, factory-ready systems.

From Volume to Velocity: Scaling Multi-Family Projects Without Losing Control

When projects grow too fast without the right systems, factories run into problems. They miss deadlines, crews burn out, and quality drops. Instead of steady progress, chaos takes over. Things slow down, even with more units going through. That’s because building more isn’t enough—you also need to build smarter. That means shifting focus from volume to velocity.

The Missing Link in Modular: Developer Relevance & Messaging

Many affordable housing developers have looked at modular. Maybe even tried it. And it’s complicated. And here’s the truth: It not anybody’s fault.
The problem isn’t the fabricator, architect or GC. It’s everything that happens between them. That’s where modular breaks down. And that’s where a Rooms as a Product approach changes the game.