Scalable & Smart EV Charging Containers
Powering EV Fleets with NexE Container Enclosures
NexE, the green energy sister company of TECO-Westinghouse, partnered with Falcon Structures to design and build portable enclosures for EV fleet operators interested in re-deployable units that support EV charging depots with significant cost savings. The goal: create durable, relocatable EV infrastructure solutions that sidestep the constraints of traditional construction.
Overcoming Traditional Infrastructure Limits
To meet the growing demands of their fleet customers, NexE needed a robust enclosure that could house all the necessary electrical equipment, deploy quickly, relocate easily, and withstand a wide range of environmental conditions.
Traditional construction wasn’t an option, especially on leased land or in dense urban areas where trenching isn’t feasible. Installation time was another key challenge. For EV fleet operators, pre-assembled, quick-connect solutions are critical to staying on schedule and avoiding costly delays.
Durability was another concern. From Canadian winters to Florida humidity, the enclosure had to protect sensitive equipment in every climate the fleet might operate in.
NexE solves these challenges with a compact, modular system that streamlines deployment without compromising safety, functionality, or code compliance to meet their customer’s needs.
To bring the full solution to life, they needed a reliable partner with proven experience in fabricating durable, customized enclosures. That is where Falcon stepped in, providing a robust container built to NexE’s specifications with precision cutouts and structural modifications to support the electrical design without delay.
“Falcon Structures was an experienced and responsive container expert for this project. From the start, their team was committed to our vision for an EV charging enclosure. They handled structural modifications, openings, and climate control exactly to spec, which made it easy for us to install our equipment without compromise. It was an excellent collaboration.”
- NexE
Container Concept to EV-Ready Prototype
After touring Falcon’s container manufacturing facility outside of Austin, Texas, NexE collaborated with Falcon’s engineering team to design a 20-foot modified container tailored to the project’s exact requirements.
Falcon delivered the prototype container with custom cutouts, framed openings, mounted electrical panels and wiring, lighting, and ventilation. NexE, in collaboration with their partners, engineered the EV infrastructure to fit within the 20-foot container, which is equipped with 2000A switchgear, dual power inputs, and a smart on-site communication system capable of powering up to 50 EV chargers simultaneously.
After its debut at the Advanced Clean Transportation (ACT) Expo, the NexE team was able to ship the container to its first destination in Brooklyn, New York. Nearly turnkey, the partnership between NexE and Falcon Structures delivered a portable and durable prototype for scalable and smart EV charging.
More from Modular Advantage
From Model to Machine: Why Modular Scale Is Becoming a Software Problem, not a Material One
For modular manufacturers that have already secured demand and repeatable volume, the next major constraint may no longer be forming capacity itself. Increasingly, it is the continuity of the information feeding that capacity.
Who Will Define Modular Products for AI?
Artificial intelligence is making building configurators easier and less expensive to create. This makes urgent manufacturers’ need portable product definitions, stable identities, and shared interfaces regardless of how others’ software is produced.
From BIM to Robotic Production: A Digital Workflow for Customized Components in Volumetric Modular Construction
For volumetric modular manufacturers, the value of this workflow is not simply the use of robotics. Its real value is continuity.
Helping Build a Common Framework for Modular Construction in Canada
Canada’s modular construction sector continues to gain momentum, but scaling it successfully will depend on shared expectations across design, manufacturing, approvals, and project delivery. CSA Z251 helps provide that common foundation.
Edges, Exits & Equipment: A Modular Builder’s Guide to Rooftop Access
Rooftop access belongs in the factory design. Before the modules ship, the project team should identify each route’s users, confirm applicable requirements, coordinate with the roof system and structure, and assign responsibility.
When Timber Production and Modular Construction Share One System
As demand for multifamily and workforce housing continues to outpace what conventional construction timelines can deliver, models that reduce the number of handoffs between structural fabrication and modular assembly are likely to draw more attention.
Your AI Strategy Is an Enablement Strategy
Tools will change. Teaching employees only the steps in one platform creates a narrow capability. Involving them in problem definition, process mapping, data assessment, controls, and measurement gives the organization a way to improve its systems as technology evolves.
By-Right Permitting: The Missing Lever for Scaling Modular Multifamily
Modular has already proven it can outperform traditional building methods on speed and cost per unit. The next frontier is outside the factory in the front end of the process, where projects either clear a path to construction or get stuck in review.
Remote Inspections and The Future of Factory Oversight
Remote inspection is becoming a practical part of modular construction oversight. Its value is greatest when it is used selectively, governed by clear procedures, and supported by complete traceability.
Reimagining Dry-In: How a Temporary-to-Permanent Roofing Strategy Mitigates Risk Between Modular Installation and Final Roof Construction
As volumetric modular projects continue to increase in scale and complexity, the Temporary-to-Permanent FiberTite Roof System represents an example of how traditional trade scopes can be reimagined through Design for Manufacturing and Assembly (DfMA) principles.