Skip to content

MBI Issues Policy Position on Tariffs & Their Impact on Modular Construction. Read the statement here.

Elevating Customer Experience

Revolutionizing Inpro’s Manufacturing with Innovative Processes and Technology

Ayla Starr Headshot
Ayla Starr works at Inpro Corporation.

With a commitment to customer and employee experience, a dedicated team within Inpro’s Commercial Washroom Division embarked on a journey to leverage cutting-edge technology and improved processes starting at the production line.

Inpro’s Commercial Washroom Division manufactures shower bases, walls, partitions, seats and more, serving customers all over the world in Elevating Customer Experience industries like healthcare, education, and even modular construction.

As Matt Budnik, the division’s Senior Sales Director, simply put it: “Inpro is dedicated to investing in ways that help us hit our customers’ deadlines even faster.”

And yesterday’s unveiling of the latest technology on the manufacturing floor, was a great reminder of the remarkable impact this team’s innovation has had on various aspects of the business.

Inpro’s Commercial Washroom Division cutting ribbon to unveil new technology.
Lean Six Sigma and 3P – Production Preparation Process.

A Collaborative Quest for Improvement

Early last year, the Commercial Washroom Division team embarked on a mission to boost throughput by an impressive 30%. This mission encompassed manufacturing advancement, employee well-being, environmental sustainability, enhanced quality control and amplified capacity.

The team mapped out the manufacturing sector of our washroom’s secondary pour area, unveiling existing issues that begged for innovative solutions. Recognizing the need to rethink the layout and incorporate modern equipment, a team of internal operations and support partners joined forces, employing the minds throughout Inpro’s various departments.

To achieve their vision, the team turned to utilizing Lean Six Sigma and 3P – Production Preparation Process.

Lean Six Sigma is a process improvement approach that combines Lean Management and Six Sigma. The goal is to improve performance by eliminating waste and defects. Lean Six Sigma uses a team-based approach to systematically remove waste and reduce process variation.

3P is an events-based method for simultaneously developing new products, and the standards and workflows to support them, particularly to elevate product design and/or production.

The scope and “hows” of the project evolved over time, but one aspect remained constant: collaboration.

group photo

The Driving Force Behind the Transformation

By integrating new technology, the goals of this project aimed to bolster manufacturing capacity and streamline turnaround times. The results did just that.

  • The ergonomic design of new cranes ensured both efficiency and employee safety.
  • Upgrading to energy-efficient ovens demonstrated the application of Inpro’s commitment to environmental responsibility.

But the integration of technology wasn’t merely about efficiency—it was also about quality assurance. The newly adopted processes allowed for meticulous control at every stage, from mixing to pouring and curing. This commitment to precision directly translated to a higher standard of product quality.

Dave Hendrickson, Plant Manager of the Commercial Washroom Division, remarked: “Utilizing the 3P methodology our team came up with a plan to not only meet our current goal of a 30% throughput improvement; but at the minimum allow us to double that throughput. With the input of frontline employees and the support of senior management, we are utilizing automation to allow us to decrease lead times, increase quality, and improve the safety of our partners on the operations floor.”

  • These advancements significantly increased the division’s capacity to serve its clients, effectively doubling Inpro’s ability to meet our commercial washroom deadlines.
  • Shipping logistics underwent a strategic repositioning, optimizing for present and future shipping volumes.
  • Racking systems were strategically installed for efficient storage of raw materials, packaging, and finished products.
  • Post-cure ovens helped decrease noise, improve energy efficiency, and enhance productivity.
  • Bridge cranes now spanned a larger area, accommodating simultaneous production of varied base sizes and styles.

And Monday’s ribbon-cutting ceremony of the new Autocaster machine was a reminder of the progress that’s been made over this last year. The Autocaster removes the laborious task of manually gathering, weighing, and mixing raw materials with technology that allows the machine to perform those tasks according to a strict recipe, controlled by an operator.

The new Autocaster took a process that once consumed 75-90 minutes, streamlining it to a mere 10 minutes.

“Since we began this project a year ago, the scope has changed and changed again somewhat,” says Zach Frankowski, Continuous Improvement Manager. “The group at every step has worked together and collaborated each time to ensure they had buy-in from each other. I am so excited for this team and the journey of improvement they are on. This has been an awesome project and we are already working on the next area of opportunity for our Commercial Washrooms division.”

IMG_4283

This team’s dedication to elevating customer experience through technology and innovative processes is a testament to Inpro’s commitment to customer delight. By enhancing manufacturing efficiency, product quality, and overall capacity, the Commercial Washrooms Division has not only met the needs of the facilities and the building professionals that serve them, but has set a new standard for customer-centric manufacturing in the industry.

More from Modular Advantage

Homes as Essential Infrastructure

The housing crisis is nothing new. Across the world, federal, state, and municipal governments of all sizes are struggling with how to provide more affordable housing—quickly—to those who need it. In Canada, Paul Halucha, Deputy Minister of Housing, Infrastructure, and Communities Canada (HICC), argues that the federal role in housing has shifted from funding at arm’s length to actively shaping outcomes.

Building the Future, Offsite

In the face of a national housing crisis, England stands at a critical inflection point where innovation, scale, and public-private partnerships must converge to meet an urgent need: more homes, and fast. Homes England is helping reshape the housing market by actively supporting MMC through a strategic blend of land development, financing, and grants.

How POJI and MOKO Are Industrializing Modular Construction Through Automated Engineering Systems

Working with Scandinavian Industrialized Building System (SIBS), POJI and MOKO helped realize a modular city concept located in Järfälla municipality of Stockholm, Sweden, with 350 apartments, communal areas, restaurants, small shops, and a preschool in a pleasant mix with experiential architecture and greenery.

Inside Boutique Modern’s Mission to Make First Homes Affordable and Efficient in The U.K.

The U.K.-based firm has been in business for 12 years, manufacturing houses for both private clients and local government, with a large chunk of its business coming from “affordable” and social housing. Working in a 32,000 square-foot factory in Newhaven, Sussex, Boutique Modern is changing decades-old thinking about constructing houses, all through the use of modular.

BoulderMOD: Producing Affordable Modular Homes While Training the Workforce of the Future

Colorado has been hit with a double whammy—a decline in the number of skilled construction workers and an increased need for affordable housing. BoulderMOD, a partnership among the city of Boulder, Flatirons Habitat for Humanity, and Boulder Valley School District, is tackling both problems and helping others do the same.

Guerdon: Seeking the ‘Holy Grail’ of Modular Construction

Guerdon, a modular manufacturer in Boise, Idaho, recently won what Laurence (Lad) Dawson, CEO and Managing Partner, describes as the ‘holy grail’ for a modular manufacturer. The RFP calls for a pipeline of six projects, totaling approximately 570
units.

State of Modular in 2025: Facing Reality

The critical and urgent reality is that the modular industry needs to open the doors to collaboration across all sectors. The sooner we stare down these challenges, the sooner we can welcome a new reality where modular is the dominant way to deliver housing for better performance, quality and all at a lower cost.

Modular Multifamily Housing as a Scalable Solution to the Housing Crisis

GreenStaxx provides a real-world, scalable solution through its standardized library of modular-ready multifamily designs and its innovative triple-decker model. Together, these offerings address the industry’s two greatest needs: efficiency and adaptability. By focusing on quality, repeatability, and collaboration, GreenStaxx is helping move modular construction from niche to mainstream and offering a practical path toward solving the housing shortage.

Sealed for Success: The Role of Waterproofing in Modular Construction

Water is one of the biggest threats to any building, causing structural damage, mold growth, and costly repairs if not properly managed. Waterproofing is the first line of defense, ensuring durability and long-term performance. As construction methods evolve, so do waterproofing solutions – moving beyond traditional coatings to advanced, factory-ready systems.

From Volume to Velocity: Scaling Multi-Family Projects Without Losing Control

When projects grow too fast without the right systems, factories run into problems. They miss deadlines, crews burn out, and quality drops. Instead of steady progress, chaos takes over. Things slow down, even with more units going through. That’s because building more isn’t enough—you also need to build smarter. That means shifting focus from volume to velocity.