Manchester Public Schools Temporary Classroom Space
Project Overview
The Manchester School District in New Hampshire embarked on an ambitious $306 million facilities modernization project in 2024. As part of this initiative, the district implemented a strategic plan to utilize modular classrooms during the renovation and construction process. Triumph Modular won the contract to provide and install 72 modular units across six schools in Manchester. These units included 56 classrooms, encompassing 59,730 square feet and accommodating up to 910 students. Additionally, 16 units were designated for offices, meeting rooms, and other educational purposes.
Project Timeline
The project commenced with the arrival of the first modular unit on June 1, 2024. Following this, a rolling delivery and installation schedule continued throughout the summer months. By August 28, 2024, all modular classrooms were ready for occupancy, ensuring students had access right at the start of the school year.
Scope of Work
Triumph Modular’s responsibilities were comprehensive, encompassing foundation preparation, unit installation, and the connection of essential utilities such as electricity, lighting, HVAC systems, and data networks. This meticulous attention to detail ensured that each classroom was fully equipped and ready for occupancy.
Project Partners
The project’s success was possible through collaboration among several key stakeholders. The Manchester School District worked closely with Consigli Construction, which managed site preparations, and Triumph Modular, which focused on providing the modular classrooms. This partnership exemplified effective teamwork in addressing the challenges posed by extensive renovations.
Impact and Benefits
The implementation of modular classrooms significantly impacts the school district. The buildings can accommodate up to 1,000 students during construction, allowing education to proceed without interruption. The modern and fully equipped modular learning spaces ensure a smooth transition for both students and staff. Additionally, this approach supports a phased renovation strategy across the district. The Manchester School District is effectively using modular classrooms as a flexible solution to maintain educational continuity during a major facilities overhaul.
More from Modular Advantage
T.R. Arnold: The Art of Third-Party Inspections
T.R. Arnold (TRA), a third-party inspection company in Elkhart, Indiana, contracts with modular manufacturers across the US. Manufacturers register with each state to which they intend to send their modules and may be required to hire a third-party inspection company.
Creating an ‘Ecosystem for Innovation:’ 50+ Years of Modular Construction Oversight in Virginia
Virginia’s modular building program began in 1973, with the implementation of the Virginia Industrialized Building Unit and Mobile Home Safety Regulations. Now it’s leading the country in modular code adoption.
Understanding Thermal Barriers Compliance Methods & Emerging NFPA-275 Foam Plastic Technologies
New fire barrier technologies are improving total costs and margins in major areas of construction, such as commercial, government, union and prevailing wage projects. These benefits translate into other large fringe areas, such as agriculture, commercial cold storage facilities, grow houses, outbuildings, military and aviation hangars.
Financing the Future of Modular Construction: How Better Capital Strategies Can Help the Industry Scale
The future of construction will not be solved by one product, one lender, or one financing model. It will be solved by matching the right project with the right capital strategy.
Building Customized Technical Containers for Data Centers and the Energy Sector
Modern data centers must not only be highly efficient but also flexible and secure. One answer to these core challenges is modular data centers housed in containers.
Printing the Future of Modular Construction
For the modular and offsite construction industry, 3D concrete printing should not be viewed as a competing construction method. It should be understood as a potential expansion of the industrialized construction toolkit.
Quality Control for Modular Houses Manufactured in Asia
In modular construction, prevention is far cheaper than correction. A good inspection plan protects the buyer, supports the supplier, and helps the final project succeed.
Housing Without Borders: Go Global with Haskell Modular Solutions
With the capacity to service over 15 diverse markets across multiple continents, Haskell is the reliable choice for our 80% repeat client base no matter how their needs evolve. So, when a longstanding client—typically known for their large-scale, institutional buildings—engaged Haskell with a very different need—multinational
housing projects—Haskell knew exactly what approach to take.
ProSet Co-founder Shares Expertise to Help Ensure Safe and Secure Modular Connections in Colorado
ProSet co-founder Matt Mitchell created and teaches an 8-hour course, based on Colorado’s modular installation regulations.
Women in Construction – Reflections on a Journey, Then and Now
From industry veteran Laurie Robert, a retrospective for women who are thinking about entering the modular construction industry or are looking to elevate their current position into leadership.