Choosing the Right Ramp

Why Modular May Be the Smarter Investment

Matthew Brown Strategic Business Development Manager FlexDecks

Matthew Brown is the Strategic Business Development Manager at FlexDecks.

Accessibility is a crucial consideration for residential, commercial, and mixed-use properties thanks to the Americans with Disabilities Act (ADA), signed into law 35 years ago in 1990. Major renovations require at least 60% of public entrances to be accessible (ADA 206.4.1) and entrances are the most visible compliance risk for most buildings. It’s important to get that right with the correct ramp, stair, and landing design, and compliance to local and national standards like the ADA and International Building Code (IBC) enhances property value and improves tenant satisfaction, while minimizing risk for the business.

Historically, ADA and IBC entrances have been designed and built using traditional methods like timber, concrete, and custom metal fabrication. This approach can suffer from expensive design and QA resources to deliver consistent, high-quality results. Skilled labour and variable field conditions will slow down construction and often require build times of weeks or months to complete.

Modular-Ramp-for-Modular-Hospital_1200x900
Modular-ADA-Egress-Stairs_1200x900

Modular ADA egress stairs.

Challenges of Traditional Construction

Traditional construction methods are time consuming. It is labor intensive with little room for automation or concurrent work schedules, so trying to move faster only introduces more problems like safety and quality risks along with an increased likelihood of costly mistakes. Limited control over schedules means limited control over costs, with slow build times adding significant labor costs.

Labor is also specialized, with tradespeople constructing or fabricating at the site. These trades are costly and rightfully so — the skills needed are difficult to get and can produce some amazing results. The problem is that some aspects of construction simply do not need that level of ability in the field and asking general labor to do the same task introduces significant risk to the quality of the result.

Controlling the onsite environment is limited, affecting quality, speed, and even safety. Weather conditions can wreak havoc on the most meticulous plans, even with well-prepared contingencies to protect building materials and schedules. Traffic, pedestrians, other local construction, and even political activity can hamper schedules and disrupt progress, adding significant cost to the project. Safety on a construction site is deadly serious — OSHA reports 1069 construction fatalities in 2022.

Compliance with safety standards is already difficult and delivering a safety and/or compliance-based scope of work becomes even more challenging to deliver in real world conditions. OSHA, IBC, ADA, NEC — the codes may be clear, but construction of a solution with many onsite variables adds risk to the result and a potentially costly inspection cycle.

Finally, layers of approval and review are needed for fabricated, traditional construction building components. This is critically important as the design is new every time and the work must be meticulously controlled to deliver the expected result for the Owner. Documentation must be organized and trustworthy, adding further risk as multiple parties get involved.

Modular-ADA-Ramp-for-Public-Access-(landing)_1200x800
Modular-ADA-Ramp-for-Public-Access-(front)_1200x800

Modular ADA ramp for public access.

Benefits of Modular Construction

Modular construction solves these problems directly, and the goal is still the same — we want a quality, reliable structure that meets the functional requirements and satisfies compliance. Modular entrance systems offer flexible design parameters and integrated engineering to provide a reliable and compliant result. Design loads are easily calculated thanks to offsite construction of all components, and all requirements will be considered to deliver peace of mind. Even late-stage changes can be accommodated with rapid redesign and deployment of modular components.

Installation for most configurations can be done in days, not weeks or months. Mechanical assembly requires only common labor and hand tools, and components are manufactured in a controlled environment following standard processes that deliver reliable quality. Unexpected conditions can be solved with in-stock, standard components instead of a costly and time-consuming redesign.

Conclusion

Modular construction offers a compelling alternative to traditional methods for designing and building ADA and IBC-compliant entrances. By addressing the challenges of traditional construction, such as time-consuming processes, unavailable specialized labor, and variable field conditions, modular solutions provide a more efficient, cost-effective, and reliable approach. The benefits of modular construction, including flexible design parameters, rapid installation, and consistent quality, make it an attractive option for property owners and managers seeking to enhance accessibility and compliance while minimizing risks.

More from Modular Advantage

From Model to Machine: Why Modular Scale Is Becoming a Software Problem, not a Material One

For modular manufacturers that have already secured demand and repeatable volume, the next major constraint may no longer be forming capacity itself. Increasingly, it is the continuity of the information feeding that capacity.

Who Will Define Modular Products for AI?

Artificial intelligence is making building configurators easier and less expensive to create. This makes urgent manufacturers’ need portable product definitions, stable identities, and shared interfaces regardless of how others’ software is produced.

From BIM to Robotic Production: A Digital Workflow for Customized Components in Volumetric Modular Construction

For volumetric modular manufacturers, the value of this workflow is not simply the use of robotics. Its real value is continuity.

Helping Build a Common Framework for Modular Construction in Canada

Canada’s modular construction sector continues to gain momentum, but scaling it successfully will depend on shared expectations across design, manufacturing, approvals, and project delivery. CSA Z251 helps provide that common foundation.

Edges, Exits & Equipment: A Modular Builder’s Guide to Rooftop Access

Rooftop access belongs in the factory design. Before the modules ship, the project team should identify each route’s users, confirm applicable requirements, coordinate with the roof system and structure, and assign responsibility.

When Timber Production and Modular Construction Share One System

As demand for multifamily and workforce housing continues to outpace what conventional construction timelines can deliver, models that reduce the number of handoffs between structural fabrication and modular assembly are likely to draw more attention.

Your AI Strategy Is an Enablement Strategy

Tools will change. Teaching employees only the steps in one platform creates a narrow capability. Involving them in problem definition, process mapping, data assessment, controls, and measurement gives the organization a way to improve its systems as technology evolves.

By-Right Permitting: The Missing Lever for Scaling Modular Multifamily

Modular has already proven it can outperform traditional building methods on speed and cost per unit. The next frontier is outside the factory in the front end of the process, where projects either clear a path to construction or get stuck in review.

Remote Inspections and The Future of Factory Oversight

Remote inspection is becoming a practical part of modular construction oversight. Its value is greatest when it is used selectively, governed by clear procedures, and supported by complete traceability.

Reimagining Dry-In: How a Temporary-to-Permanent Roofing Strategy Mitigates Risk Between Modular Installation and Final Roof Construction

As volumetric modular projects continue to increase in scale and complexity, the Temporary-to-Permanent FiberTite Roof System represents an example of how traditional trade scopes can be reimagined through Design for Manufacturing and Assembly (DfMA) principles.