Ramtech Building Systems - Permanent School Campus
This project provides space for 24 standard classrooms to accommodate up to 528 additional students. The building has five special-use classrooms for the school’s art, music, speech, and special education programs. It also includes a cafeteria with a warming kitchen, administrative offices, a library, tutoring center and learning lab, and a 3,000 square foot multipurpose exercise room with athletic flooring and a 14 foot ceiling height. We incorporated a mix of masonry and EFIS that complemented the existing structures and provided a cohesive appearance to the campus. Interior finish selections were largely driven by the educational use and included painted gypsum, resilient and ceramic tile as well as an acoustical drop ceiling.
Ramtech developed our Slab-on-Grade PMC System as an efficient means to provide concrete floors while dealing with the highly expansive soils found throughout Texas. Conventional pier and beam PMC installations require a grade-beam or stem-wall foundation supported typically by under-reamed drilled piers. Then a conventional block pier supports a steel modular floor system with a corrugated steel deck and three inches of poured light-weight concrete.
This redundancy of structures (expense of foundation and a modular floor system) adds considerable cost to the project. By utilizing a poured-in-place conventional concrete slab as prescribed by the geotechnical engineer, then placing a floorless module directly atop the slab, three things are achieved at a lesser cost: better floor acoustics due to more mass (quiet floors); a grade level entry is provided at all exterior doors; and there is no crawlspace to ventilate, greatly reducing the possibility of poor indoor air quality.
This article originally appeared in the Modular Advantage Magazine - First Quarter 2018 released in February 2018.
More from Modular Advantage
How Stack Modular Is Using AI to De-Risk Mid- to High-Rise Modular Construction
Artificial intelligence is no longer a future concept in modular construction—it is already reshaping how complex buildings are evaluated, designed, and delivered.
Gearing Up for the 2026 World of Modular
The Modular Building Institute (MBI) is bringing its global World of Modular (WOM) conference and tradeshow back to Las Vegas in April, and with it comes some of the industry’s best opportunities for networking, business development, and education.
New High-Rise Modular Apartment in Abu Dhabi Points Toward the Future of Multifamily Construction
Eagle Hills International Properties chose the BROAD Holon Building for a 16-story market rate apartment building in Zayed City, a central business district of Abu Dhabi. The project highlights the potential of the Holon system of volumetric modular construction to accelerate housing delivery.
MBI Announces First Ever Industry Apprenticeship Program in Collaboration with Marshall Advanced Manufacturing Center
MBI recently agreed to partner with Marshall Advanced Manufacturing Center (MAMC) to provide bona fide USDOL-approved apprenticeship programs for the industry.
AoRa Development Aims for New York’s First Triple Net Zero Building Using Modular Methods
More cities are providing funding for newer infrastructure projects as long as they meet sustainability requirements. This is how modular can fit the bill, thanks to its lower waste production.
Developers and Designers: Lessons Learned with Modular Design
Modular construction is attractive to many developers because sitework and module construction can occur simultaneously, shortening the schedule and reducing additional costs.
UTILE: Putting Modular Building on a Fast Track
In Quebec, UTILE is taking the lead in creating affordable modular buildings to help decrease the student housing shortage. During the process, the company discovered what it takes to make the transition to modular building a success.
Sobha Modular Teaches Developers How to Think Like Manufacturers
With its 2.7 million square foot factory in UAE, Sobha Modular is bringing both its high-end bathroom pods to high-end residences to Dubai while developing modular projects for the U.S. and Australia.
RoadMasters: Why Early Transport Planning is Make-or-Break in Modular Construction
In modular construction, transportation is often called the “missing link.” While it rarely stops a project outright, poor planning can trigger costly delays, rerouting, and budget overruns.
Navigating Risk in Commercial Real Estate and Modular Construction: Insights from a 44-Year Industry Veteran
Modular projects involve manufacturing, transportation, and on-site assembly. Developers must understand exactly what they are responsible for versus what they subcontract. Risk advisors should research the developer’s contractors, subcontractors, and design-build consultants—especially the modular manufacturer.