Autogyron

Company: POJI AB
Affiliates: SIBIS, MOKO
Location: Örebro, Sweden
Gross Size of Project: 89,114 Square Feet
Days to Complete: 780

Award Criteria

Architectural Excellence

Autogyron is a green, active district with 117 rental apartments, each with a balcony or patio and offered at affordable rents. The buildings reflect SIBS’s architectural ambition with pleasant courtyards and quality design to create homes where people thrive and feel proud. Waterborne underfloor heating, rooftop solar panels, and geothermal heating ensure sustainable operation. The area features pedestrian zones, car-free paths, trails, and exercise loops. Surrounding traffic flows support commerce and activity, shaping a vibrant urban character. Autogyron is a strong example of SIBS’s care in project completion, realized in close alignment with the municipality and original vision, contributing positively to the entire area.

Technical Innovation & Sustainability

SIBS modular construction enables rapid, flexible residential development with high architectural variation. Offsite precision engineering and robotic manufacturing ensure tight tolerances, enhancing airtightness, acoustics, and vibration control. Modules can be delivered fully furnished, reducing on-site work and enabling relocatability. Design automation halves planning time, while parametric systems meet diverse regulatory and aesthetic needs. Material efficiency is achieved through reduced concrete use and direct sourcing, yielding ~15% cost savings. The system supports green building via minimized waste, energy-efficient assembly, and reuse of components.

Cost Effectiveness

SIBS modular construction achieves cost-effectiveness through factory-based production, reducing labor costs and material waste. Modules are pre-finished with kitchens, bathrooms, and sometimes furnitured, minimizing on-site work. Installation is rapid, electrical and plumbing connections take under one hour per unit. Materials like steel, gypsum, and insulation are sourced directly, yielding ~15% cost savings. The plug-and-play system allows integration with conventional podiums and supports relocatability via dismantlable connectors. Partnerships with subcontractors and automated design tools further streamline timelines, cutting design phases by 50% and total construction time by over 40%