Skip to content

MBI Issues Policy Position on Tariffs & Their Impact on Modular Construction. Read the statement here.

Modular Units for Therapeutic Rooms at Instituto Chileno Japonés and Consultation Rooms at San Borja Arriarán Clinical Hospital.

Company: Tecno Fast S.A
Location: Santiago, Chile
Gross Size of Project: 7,760 Square Feet
Days to Complete: 679

Award Criteria

Architectural Excellence

The surgical and consultation building spans two floors, each 345 m², composed of two modular structures connected by corridors. With 92% modular and 8% metallic construction, it meets the Ministry of Health’s height requirements. The first floor features two medium-complexity operating rooms, a recovery area for four patients, a family waiting room, and spaces for storage, biopsy management, and waste disposal. The second floor houses independent consultation rooms accessible via stairs or an elevator.

Tecno Fast integrated climate control, medical gases, and electrical systems, using BIM to eliminate interferences and ensure efficient on-site assembly. A 40 cm gap between floors facilitated duct and cable installation, preserving clean interior finishes. Manufactured at Tecno Fast’s Colina plant, the project showcases modular construction’s adaptability and efficiency, offering sustainable, innovative healthcare solutions.

Technical Innovation & Sustainability

Tecno Fast took on the challenge of building medium-complexity surgical rooms for San Borja Hospital within a fixed budget and tight timeline, overcoming regulatory and spatial constraints. The design featured 3-meter-high interiors to house climate control ducts, ensuring a clear 2.4-meter height, along with air injection, extraction, humidity and temperature control, medical gases, and lead-lined finishes, meeting all regulatory standards.

An elevator with fire-resistant panels was installed to ensure universal accessibility, connecting surgical rooms and consultation areas. Successfully delivered, the project highlights Tecno Fast’s leadership in modular healthcare solutions, extending its expertise from consultation rooms and emergency facilities to surgical spaces. This milestone paves the way for efficient, adaptable solutions across Chile, reinforcing Tecno Fast’s reputation in innovative modular construction

Cost Effectiveness

Modular construction offers unmatched efficiency and cost-effectiveness compared to traditional methods. With 85% of work completed off-site, modules are rapidly assembled and finished on location, significantly reducing project timelines and minimizing disruption. This speed translates to substantial savings for clients, both financially and in operational readiness. Moreover, modular solutions are highly adaptable, enabling effortless repurposing of spaces with minimal adjustments, ensuring long-term value.

This project solidifies Tecno Fast’s position as a trusted partner for San Borja Hospital, delivering innovative, high-quality healthcare spaces. With 6,500 m² of modular solutions implemented for this key client, Tecno Fast has established itself as the leader in modular construction for the healthcare industry, setting a new benchmark for efficiency, versatility, and client satisfaction.

See More Awards of Distinction Winners

To view all our current honorees, visit our main Awards page.