Skip to content

MBI Files Federal Lawsuit Against Oregon Prevailing Wage Expansion. Read the press release here.

Home  |  Contact Us  |  Member Login  |  Support

Building the Future, Offsite

How Homes England is Unlocking Housing Potential Through Modern Methods of Construction

Shapland-Place-Drone1-copyright-ZED-PODS-Ltd_1200x764

A modular housing development at Shapland Place in Tiverton, Devon, England. Built by Zed Pods. © ZED PODS Limited.

In the face of a national housing crisis, England stands at a critical inflection point where innovation, scale, and public-private partnerships must converge to meet an urgent need: more homes, and fast.

The UK’s housing backlog is stark. The government has set a five-year target of building at least 1.5 million homes to meet demand – a number far beyond what’s currently being delivered. The situation is exacerbated by labor shortages in traditional construction, supply chain disruptions, and lengthy planning processes.

One of the most promising answers to this challenge isn’t just found onsite, but off. Modular and other Modern Methods of Construction (MMC) have an important role to play in accelerating housing delivery. Homes England, the government’s housing and regeneration agency, is leading the charge.

While the Ministry of Housing, Communities and Local Government (comparable to the U.S. Department of Housing and Urban Development [HUD]) is responsible for designing planning regulations, building codes, and political oversight, Homes England functions as an arm’s-length delivery body. It manages and allocates approximately £20 billion in public funds across England (excluding devolved governments in Scotland, Wales, and Northern Ireland) to drive forward housing delivery goals.

One such goal has been to support modular as a mainstream solution rather than a fringe alternative. At the heart of that effort is Edward Jezeph, who oversees MMC at the agency.

“There is a chronic shortage of housing in the UK,” Jezeph says. “We need to build more and faster. Offsite construction gives us the tools to build high-quality homes more quickly and reliably, especially in the areas where they’re most needed.”

A Strategic Foundation for a More Resilient Housing Market

Homes England is helping reshape the housing market by actively supporting MMC through a strategic blend of land development, financing, and grants.

“Our role is to help create the conditions for a more resilient housing market,” explains Jezeph. “That means investing in innovation and helping newer, offsite-based delivery models get a foothold.”

The agency’s approach include acquiring and preparing surplus public land for sale to developers, with a scoring system that rewards the use of advanced construction techniques. Volumetric modular projects can receive the highest MMC scores, while panelized systems with factory-installed components, such as insulation and windows, also earn recognition.

Homes England also provides critical development financing, especially for small and medium-sized enterprises (SMEs) or modular developers unable to secure commercial loans, and channels affordable housing grants toward projects utilizing MMC. Twenty-five percent of this affordable housing grant funding with Homes England’s strategic partners now mandates the use of these technologies.

The Affordable Homes Program exemplifies this innovation-first strategy; the 25% MMC mandate equates to £1.3 billion for MMC projects and catalyzed partnerships with developers and local authorities willing to trial and scale new approaches.

“We’re not being overly prescriptive,” Jezeph notes. “Some projects need different solutions, but we’re encouraging people to do things differently.”

The goal is not just to fund pilot projects, but to mainstream modular and off-site delivery as viable, scalable solutions to England’s housing needs.

“We’ve learned a lot,” Jezeph adds. “We know where MMC can thrive and what still needs to be addressed, from pipeline uncertainty
to regulatory barriers.”

Shapland-Place-Drone2-copyright-ZED-PODS-Ltd_1200x764

© ZED PODS Limited.

Local Partnerships, National Potential

While some of England’s progress has been top-down, much of the momentum is now coming from regional collaboration. Through new Strategic Place Partnerships (SPPs), Homes England is working hand-in-hand with Mayoral Combined Authorities and local governments to create regional strategies for housing growth and regeneration, with MMC often at the core.

“These partnerships are about empowering local leaders,” Jezeph says. “They know their communities, they understand the barriers to
growth, and we’re here to help them navigate those barriers.”

One standout example is the Liverpool City Region, which is placing off-site construction at the heart of its long-term regeneration
plans. By aligning public investment, land strategies, and modular supply chains, Liverpool is positioning itself as a northern hub for MMC.

“We’re seeing more areas interested in building local capacity for off-site delivery - whether that’s using regional manufacturers or upskilling their workforce,” Jezeph explains. “This creates jobs, stimulates local economies, and delivers better homes faster. It’s a win all around.”

The Path Ahead: Not Just More, But Better

Even with encouraging signs, Jezeph is realistic about the road ahead. The collapse of several high-profile modular companies in recent years has raised concerns about the sector’s long-term viability.

“These challenges have forced us to think carefully about what a sustainable MMC ecosystem looks like,” he says. “It’s not just about technology or funding, it’s about pipeline certainty, skills development, and investor confidence.”

Homes England is taking steps to address each of those pressure points. By aggregating demand, facilitating data sharing, and supporting research and innovation, the agency aims to create a more stable and resilient modular market.

It also means broadening the definition of success. For Jezeph, it’s not just about how many homes get built, but whether those homes are energy-efficient, beautifully designed, and rooted in thriving communities.

“We have to reframe what we value in housing delivery,” he says. “Speed and scale matter, yes, but so do longevity, sustainability, and pride of place.”

The Power of a “Kit of Parts”

Jezeph explains the power of having a “kit of parts” - or a standardized set of components that can be configured in multiple ways to suit different housing types, tenures, and site conditions for housing delivery rooted in MMC.

“A kit of parts approach brings the best of both worlds,” Jezeph says. “You get the speed and efficiency of off-site construction, but you’re not locked into cookie-cutter design. You maintain flexibility, which is critical when working across diverse geographies and communities.”

Homes England is working with the Ministry of Housing, which is actively developing this approach. The idea is to create a shared language for modular construction where planners, developers, and manufacturers all operate from the same design playbook. That alignment not only streamlines delivery but also reduces costs, improves quality assurance, and builds long-term confidence in the system.

Lessons From International Leaders

To continue to help shape England’s future housing strategy, Homes England has looked to international examples of off-site construction success.

“There’s a lot we can learn from our international peers,” Jezeph notes. “Japan and Sweden are great examples, but I’ve also seen some really inspiring innovation in the USA and Germany.”

In 2023, Jezeph participated in US Government-led research trips to Japan and Sweden. In Japan, where earthquakes and an aging population drive a constant need for housing, modular homebuilding is deeply embedded into the market and consumer culture.

“Japan presents a unique housing landscape,” he says. “You’ve got high consumer demand, stringent seismic regulations, and homes that are often replaced every 30 years. That drives manufacturers to prioritize safety, quality, and mass customization.”

Once the Japanese government approves a housing system, manufacturers can design and produce a wide variety of homes without facing additional regulatory hurdles. The result? Faster delivery, greater flexibility, and a thriving direct-to-consumer model.

In Sweden, the approach emphasizes standardization, energy efficiency, and factory precision. This allows off-site methods to support high-quality, sustainable housing at a national scale.

“Both countries have succeeded in industrializing housing production without sacrificing design or performance,” Jezeph says. “That’s something we’re striving to replicate, while adapting it to England’s own housing landscape.”

Looking Ahead: A Modular Roadmap

So, what does the future hold for modular in England? Homes England sees an opportunity for MMC and modular homes delivered at
scale, integrated into place-based strategies, and supported by systems that ensure quality, affordability, and a strong sense of community. The key to this vision lies in a pragmatic approach, one that balances ambition with realism and innovation with delivery.

“This isn’t about chasing the next shiny object,” Jezeph says. “It’s about using proven technologies to solve real problems, and doing so in a way that benefits everyone from residents to local economies.”

Homes England continues to refine its playbook, support its partners, and champion modular solutions that are grounded in data, driven by demand, and built to last. With growing pressure on housing stock, rising sustainability standards, and the economic imperative to do more with less, the time for modular has never been more urgent or more promising.

“We’re not just building homes,” Jezeph says. “We’re building confidence. We’re building capacity. And we’re building the future.”

About the Author: John McMullen, PCM, is the marketing director for the Modular Building Institute. You can reach him directly at mcmullen@modular.org or on LinkedIn.

More from Modular Advantage

Mind the Gap: The Interface Between Onsite and Offsite Construction

Every design for manufacture and assembly (DfMA) project — modular, mass timber, or panelized — is really two projects joined at a seam. One is built in a controlled factory to millimeter tolerances; the other in the field, in weather, to the looser tolerances of poured concrete and human hands. Between them sits an interface: where the factory’s precision meets the site’s reality.

Rules, Rails & Repeatability: Applying DfMA to Modular Healthcare

DfMA offers several advantages for healthcare projects, with faster delivery among the most valuable. Schedule matters when building new facilities, expanding campuses, renovating existing space or bringing care closer to communities that need it.

Precision and Possibility: Demands of DfMA and What Modular Mass Timber Makes Possible

Mass timber does not automatically create an efficient modular building. Its precision makes early coordination more important: fabricated components will accurately reproduce both the team’s solutions and its mistakes. The material’s advantages are realized only when supported by an equally precise design and delivery process.

Catch It in the Factory, Not in the Field: Smarter Testing for Modular Builds

Integrating watertightness and airtightness testing into factory workflows transforms quality assurance from a reactive process into a proactive commissioning strategy. It ensures that every module shipped is field ready and resilient for transportation while also supporting the ability of the modular construction industry to make buildings better.

Modular Construction Contracts: Key Considerations for Successful Canadian Projects

Starting a modular project with a well-developed contract protects both the owner and the contractor. It will help keep the project on track and on budget, and it will improve quality from the factory floor to final installation on-site.

Modular by Design: Turning Architecture into a Manufacturing System

Modular construction is often presented as a faster way to build. Speed, however, is only one part of its value. The larger opportunity is to create a coordinated design and production system that improves quality, reduces uncertainty, and allows a building to move efficiently from concept design through manufacturing, transportation, installation, and completion.

Repeatability Begins with Trust: What Alora at Dry Creek Reveals About Scaling Modular Housing

Alora at Dry Creek, a 329-unit, multifamily community comprising five four-story buildings in Centennial, Colorado, demonstrates how repeatable design, standardized manufacturing and early collaboration can work together to create a model that is not only faster to deliver, but easier to replicate across future projects.

T.R. Arnold: The Art of Third-Party Inspections

T.R. Arnold (TRA), a third-party inspection company in Elkhart, Indiana, contracts with modular manufacturers across the US. Manufacturers register with each state to which they intend to send their modules and may be required to hire a third-party inspection company.

Creating an ‘Ecosystem for Innovation:’ 50+ Years of Modular Construction Oversight in Virginia

Virginia’s modular building program began in 1973, with the implementation of the Virginia Industrialized Building Unit and Mobile Home Safety Regulations. Now it’s leading the country in modular code adoption.

Understanding Thermal Barriers Compliance Methods & Emerging NFPA-275 Foam Plastic Technologies

New fire barrier technologies are improving total costs and margins in major areas of construction, such as commercial, government, union and prevailing wage projects. These benefits translate into other large fringe areas, such as agriculture, commercial cold storage facilities, grow houses, outbuildings, military and aviation hangars.