Modular Building Institute

Parker Charter Essential School

(Click an image below to see enlargement)
Main Category:
Modular Building Design
Company:
Triumph Modular
Affiliate:
Triumph Modular
Location:
Devens, MA
Building Use:
School Addition
Gross Size of Project:
25000 Square Feet
Days to complete:
213

Award Criteria

  1. Architectural Excellence
    Triumph successfully completed the largest modular move in New England history in collaboration with Tappe Associates, DTI Inc., and the Sizer Foundation. The modulars were set in place by a 365 ton crane on piered foundation and frost wall. The Parker Charter Essential School addition features two-tone hardieplank siding to match the surrounding community at Fort Devens. Triumph Modular installed custom steel fabricated railings and wire mesh in the connecting corridor, making for an excellent transition from the existing school to the new school. Vinyl composition tile was installed using MORSE code consisting of clever quotes chosen by the students and teachers of the Parker School. Since this was a controlled construction project, each major milestone of the project was monitored by our engineers - Civil, Fire Protection, Structural, Mechanical, Electrical, Plumbing and Architectural.
  2. Technical Innovation & Sustainability
    Due to the renovated reuse of this project, the method in which this 25,000 square foot building was removed, transported and re-installed is unique in itself. New axles were fabricated and installed to ensure a safe delivery during the 60 minute trip from Holden, MA to Devens, MA. Many upgrades were made to the new Parker school building including electrical and fire alarm upgrades as well as the implementation of new plumbing and sprinkler components. All mechanical rooftop units were cleaned, balanced and tested once construction was complete to ensure the best air quality. To meet current Massachusetts building code, a new 2,500lb hydraulic elevator was installed onsite at the Parker Charter Essential School.
  3. Cost Effectiveness
    As the largest modular relocation project in New England, all modular units were escorted safely from Wachusett School in Holden, MA to Devens, MA and installed to meet the needs of hundreds of students and teachers at the Parker Charter Essential School at half the cost of building new.
  4. Project History
    The modulars were used as a temporary school at Wachusett Valley School in Holden, MA while they renovated their permanent structure. Triumph modular moved 32 modules from Holden, MA to Devens, MA including foundation removal, and utilities. The existing stucco siding was replaced with hardie plank siding giving the building the appearance of a new school. The Parker Charter Essential School was desperate for additional classroom space to accommodate increasing enrollment. 25,000 square feet later, they are essentially in a new building. Winter conditions made this project challenging, while temporary heat and facilitation of the protection of the modulars were crucial in successfully completing this monumental job. The Parker School relocation project truly illustrates and sets the precedence of the reusability of modular construction.